PROCESS PLANT (FABRICATION)

Fabrication and supply of fully welded Sched 40 pipe sections for a process Chilled Water system.

Read More

GATWICK AIRPORT SOUTH TERMINAL HTHW RISER

CMS complete installation of a new 200mm diameter High Temperature Hot Water riser at Gatwick Airport.

Read More

COMBINED HEAT & POWER (CHP) PLANT INSTALLATION

CHP and Boiler plant installed to serve new Leisure Center.

Read More

STAINLESS STEEL PROCESS PIPE

CMS offers a stainless steel fabrication service for use on all Process, Chilled Water and Heating applications. 

Read More

HEAVY PLANT BASE FRAME

Allowing for further roof plant installations, by fitting extensions to an existing base frame. 

Read More

GATWICK AIRPORT

An ongoing CMS client involving extensive and varied works carried out at Gatwick airport throughout 2014 including construction and installation of the new gas main.

Read More

PROCESS PLANT (FABRICATION)

Fabrication and supply of fully welded Sched 40 pipe sections for a process Chilled Water system.

Read More

GATWICK AIRPORT SOUTH TERMINAL HTHW RISER

CMS complete installation of a new 200mm diameter High Temperature Hot Water riser at Gatwick Airport.

Read More

COMBINED HEAT & POWER (CHP) PLANT INSTALLATION

CHP and Boiler plant installed to serve new Leisure Center.

Read More

STAINLESS STEEL PROCESS PIPE

CMS offers a stainless steel fabrication service for use on all Process, Chilled Water and Heating applications. 

Read More

HEAVY PLANT BASE FRAME

Allowing for further roof plant installations, by fitting extensions to an existing base frame. 