PROCESS PLANT (FABRICATION)
Fabrication and supply of fully welded Sched 40 pipe sections for a process Chilled Water system.
Fabrication and supply of fully welded Sched 40 pipe sections for a process Chilled Water system.
CMS complete installation of a new 200mm diameter High Temperature Hot Water riser at Gatwick Airport.
CHP and Boiler plant installed to serve new Leisure Center.
CMS offers a stainless steel fabrication service for use on all Process, Chilled Water and Heating applications.
Allowing for further roof plant installations, by fitting extensions to an existing base frame.
An ongoing CMS client involving extensive and varied works carried out at Gatwick airport throughout 2014 including construction and installation of the new gas main.