Case Studies
Back

COMBINED HEAT & POWER (CHP) PLANT INSTALLATION

 

This was an interesting project that saw CMS fabricate and install all primary LTHW and natural gas pipe work to the new CHP and Boiler equipment within the basement plant room.  This plant is essential to supply low temperature hot water to the swimming pool heat exchangers, hot water calorifiers and fan coil units at a new Leisure Center.

There was a tight schedule on this project but works were completed efficiently and on time.

The Key Points

  • Off site fabrication
  • Zero hot works carried out on site
  • Supplied, delivered and installed
  • Works completed efficiently and on time